FAQs
More FAQs- Are there instructions to follow after my hard-surface floors are cleaned?
- How long will it take to have my hard floors coated with urethane?
- Is urethane slippery when wet?
Before you walk on your floors, it’s best to allow drying time of at least 4 hours but we recommend 8 hours. Be cautious and protect floors from getting wet for 24 hours after application of either finish as it is not yet thoroughly cured. You can return furniture to your floors (with suggested use of felt pads) after 24 hours and return rugs to floors after 24 hours.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. The coating application can be accomplished at a rate of 750 square feet per hour with a two-person crew.
Any coated surface can be slippery when wet. Our urethane product is considered to have acceptable slip resistance according to the American National Standards Institute (ANSI)/National Floor Safety Institute (NFSI) B101.3-2012 test method for measuring wet dynamic coefficient of friction (DCOF) of common hard-surface floor materials. We offer optional additives to create high slip resistance (lower probability of slipping) for wet environments or areas of concern.